Three flexible assembly options tailored to your project requirements: from precision self-assembly kits with 3D BIM step-by-step manuals, to on-site European engineer supervision and turnkey certified erection.
Ideal for regional general contractors and experienced developers. We manufacture, number, and deliver the complete kit with installation-ready 3D shop drawings. Your local crew executes the erection.
The optimal balance of speed, cost-efficiency, and engineering rigor. We deploy a bilingual SerVilla structural engineer to your jobsite to direct your local workers and verify structural compliance.
Turnkey erection executed by SerVilla’s factory-certified installation crews. Available in selected European destinations (Germany, Italy, Balkans, Greece) and multi-villa developer projects.
How a custom light gauge steel villa transforms from packed shipping container to a weather-tight structural shell in less than two weeks.
Stage 01 · Day 1
Laser slab survey, EPDM acoustic damp-proof membrane, and base track chemical anchoring into concrete.
Stage 02 · Day 2-3
Panels stood up and interlocked via pre-punched CNC dimples, diagonal shear straps, and hold-down brackets.
Stage 03 · Day 4-5
Open-web floor cassettes and roof trusses hoisted and bolted with pre-punched MEP plumbing chases.
Stage 04 · Day 6-8
OSB-3 / BoardeX exterior sheathing boards fastened to studs, providing full lateral shear diaphragm strength.
Stage 05 · Day 9-12
Breathable membrane, triple-glazed windows, and exterior cladding installed. Ready for interior fit-out.
Light gauge steel construction eliminates the need for expensive heavy tower cranes or concrete pumpers. Standard hand and power tools are all that is required.
18V/20V brushless impact drivers with magnetic hex socket bits for high-speed wafer-head steel fasteners.
Self-leveling cross-line green beam laser levels to verify 90° corner squareness and stud plumbness.
SDS-plus rotary hammer drill with 12mm / 16mm bits for concrete foundation hold-down anchoring.
Mobile aluminum scaffolding towers and adjustable steel props for temporary roof truss bracing.
When you choose Supply + Supervision, our bilingual structural engineer acts as your technical guardian on-site. We eliminate contractor hesitation, guarantee sub-millimeter tolerances, and ensure full Eurocode 3 & 8 compliance.
Learn more about equipment, crew sizes, supervision scheduling, and weather protection.
Avec une équipe de 3 à 4 monteurs, l'ossature complète (murs, planchers et charpente de toiture) est assemblée et boulonnée en 5 à 7 jours ouvrés seulement.
Aucune grue lourde n'est indispensable pour les villas de 1 à 2 étages car les profilés individuels pèsent moins de 25 kg. Des visseuses à chocs sans fil, perforateurs, niveaux laser et échafaudages légers suffisent.
Notre ingénieur vérifie la planéité de la dalle, contrôle le couple de serrage des ancrages, forme vos artisans au dossier 3D et délivre le procès-verbal officiel de réception de montage.
Choose your preferred delivery package and installation mode in our interactive quotation tool to receive a comprehensive factory-direct estimate.