Fabriqué en Turquie Conçu et Fabriqué en Turquie · Livraison dans le Monde Entier
🇭🇷 Zadar, Croatia Complete Package Supply + Supervision

Complexe Riviera Dalmate — 6 Villas Balnéaires Jumelées à Zadar, Croatie

Projet B2B : 6 villas de 125 m² (750 m² au total) pour complexe hôtelier, résistantes aux vents de Bura (>160 km/h) avec livraison échelonnée.

Project Scale
750 m² Area
2 Floors · 12 Beds · 12 Baths
Structural Mass
48.6 Tons
S350GD + Z275 Hot-Dip Galvanized
Factory & Transit
3 Days per truck batch
Direct factory-to-jobsite haulage
Site Framing Time
24 Working Days
Supervised dry erection
Engineering Case Study

Overcoming Site & Structural Constraints

The Engineering & Logistical Challenge

The developer faced an immovable opening deadline for the summer tourist season. Traditional masonry contractors quoted 14 months of construction, which would have meant missing a full season of resort revenue.

The SerVilla Pre-Engineered Steel Solution

SerVilla delivered all 6 villas in pre-engineered kits that were assembled concurrently in under one month. Enhanced structural hold-downs and diagonal steel strap cross-bracing ensured complete resistance to extreme coastal Bura wind gusts.

International Freight & Customs Route
4 flatbed TIR trucks dispatched from Istanbul across the Balkan road corridor to Zadar in 3 days per batch. Duty-free entry under A.TR certificate.
Verified Specifications

Project Data Dossier

Destination: Zadar, Croatia
Gross Area: 750 m²
Delivery Package: Complete Package
Installation Mode: Supply + Supervision
Steel Mass: 48.6 Tons (S350GD+Z275 Total)
Customs Duty: 0% (A.TR / FTA Cert.)
Milestones & Schedule

Step-by-Step Project Execution Log

From initial 3D BIM engineering in Istanbul to jobsite handover in Zadar.

Month 1 1

Master Plan Engineering & Croatian Glavni Projekt

Complete 6-villa Eurocode 3/8 calculation book and structural drawings prepared for the Croatian building permit (Građevinska dozvola).

Month 2 2

High-Speed CNC Manufacturing Batching

48 tons of cold-formed steel frames rolled simultaneously on 3 synchronized CNC lines at SerVilla’s Gebze factory.

Month 2–3 3

Phased Road Freight Deliveries (4 Mega-Trucks)

Dispatched in two-villa increments via Bulgaria and Serbia directly to Zadar without site congestion.

Month 3–4 4

Concurrent Framing & Envelope Erection

Dual assembly teams erected all 6 villas in 24 working days with SerVilla engineering supervision.

Clear Responsibility Boundary

Scope Division on the Zadar Project

Transparent delineation between factory-engineered elements and local on-site trade coordination.

Manufactured & Supplied by SerVilla

  • Complete framing kits for 6 × 125 m² villas (48.6 tons S350GD steel)
  • Comprehensive Glavni Projekt calculation dossier for all units
  • Exterior weather-resistant sheathing and thermal insulation package
  • Full fastener matrices and foundation hold-down anchoring sets
  • Two on-site structural engineers for continuous multi-unit quality control

Executed by Client & Local Contractors

  • Resort master infrastructure, concrete foundations and road paving
  • Local building permit approvals through Zadar municipal office
  • Interior fit-outs, swimming pools, and landscape architecture

SerVilla allowed us to open our resort 8 months ahead of schedule. The structural quality in high Bura wind conditions has been flawless, and our guests constantly compliment the acoustic comfort.

Luka P.
Managing Director, Adriatic Luxury Resorts · Zadar, Croatia
Case Study FAQs

Technical Questions About this Project

Frequently asked engineering, customs, and assembly questions regarding the Zadar delivery.

Nous avons dimensionné des contreventements en feuillards d'acier haute résistance et des ancrages pour une pression de vent qp = 2,2 kN/m², garantissant une sécurité totale face à la Bura.

La production et les transports sont cadencés par lots de 2 villas au fur et à mesure du coulage des dalles, permettant de monter 6 villas en 24 jours sans encombrer le chantier.

Oui. Tous les calculs respectaient les annexes croates des Eurocodes et ont été intégrés directement au dossier du Glavni Projekt.

Explore Related Work

Similar European Projects & Case Studies

Discover other high-performance steel frame homes engineered and delivered across Europe.

Villa Bellagio — Résidence de Standing en Ossature Acier sur les Rives du Lac de Côme, Italie
🇮🇹 Bellagio 314 m²

Villa Bellagio — Résidence de Standing en Ossature Acier sur les Rives du Lac de Côme, Italie

Villa sur mesure de 314 m² avec piscine en terrain alpin escarpé, dimensionnée selon les normes parasismiques italiennes NTC 2018 et livrée sans droits de douane (A.TR).

2 Floors
4 Beds
3 Baths
Weather-Tight Shell
Résidence Alpine de Bavière — Maison Passive KfW 40 en Ossature Acier à Garmisch, Allemagne
🇩🇪 Garmisch 322 m²

Résidence Alpine de Bavière — Maison Passive KfW 40 en Ossature Acier à Garmisch, Allemagne

Maison alpine contemporaine de 322 m² calculée pour des surcharges de neige extrêmes (3,5 kN/m²), Statik certifiée DIN EN 1993 et isolation RE2020/Passivhaus.

2 Floors
4 Beds
3 Baths
Structural Frame Kit + Insulation
Villa Aegean Horizon — Villa Parasismique Côtière à La Canée, Crète, Grèce
🇬🇷 Chania 229 m²

Villa Aegean Horizon — Villa Parasismique Côtière à La Canée, Crète, Grèce

Villa balnéaire de 229 m² en Crète : haute résistance parasismique (Eurocode 8 / EAK Zone III, ag = 0,36g), protection anti-corrosion marine et livraison en 3 jours.

2 Floors
3 Beds
3 Baths
Weather-Tight Shell
View All 15 European Case Studies

Build a Similar Steel Villa in Your Country

Upload your architectural drawings (PDF/DWG/IFC) or select a SerVilla design to receive an itemized budgetary quotation, Eurocode statics review, and direct shipping estimate.