Fabriqué en Turquie Conçu et Fabriqué en Turquie · Livraison dans le Monde Entier
🇬🇧 Guildford, United Kingdom Structural Frame Kit Supply + Supervision

Maison Écologique Surrey — Maison Individuelle Durable dans le Surrey, UK

Kit d'ossature acier de 181 m² conforme aux normes britanniques BS EN 1993 et Part L, importé à 0% de douane via l'accord UK-Turquie.

Project Scale
181 m² Area
2 Floors · 3 Beds · 3 Baths
Structural Mass
11.8 Tons
S350GD + Z275 Hot-Dip Galvanized
Factory & Transit
12 Days
Direct factory-to-jobsite haulage
Site Framing Time
8 Working Days
Supervised dry erection
Engineering Case Study

Overcoming Site & Structural Constraints

The Engineering & Logistical Challenge

Post-Brexit UK customs complexities and stringent Building Control approval processes (Building Regulations Part A, B, and L) created hesitations about sourcing prefabricated framing overseas.

The SerVilla Pre-Engineered Steel Solution

SerVilla supplied an airtight commercial dossier with FTA Statement on Origin (guaranteeing 0% duty) and comprehensive BS EN 1993 calculation books counter-checked for UK national annexes. The Approved Inspector signed off the structural calculations in 48 hours.

International Freight & Customs Route
Direct ocean freight via 40ft High Cube container from Gebze to London Gateway port in 12 days. Handled on DAP terms with direct container destuffing at the Surrey residential plot.
Verified Specifications

Project Data Dossier

Destination: Guildford, United Kingdom
Gross Area: 181 m²
Delivery Package: Structural Frame Kit
Installation Mode: Supply + Supervision
Steel Mass: 11.8 Tons (S350GD+Z275 Structural Steel)
Customs Duty: 0% (A.TR / FTA Cert.)
Milestones & Schedule

Step-by-Step Project Execution Log

From initial 3D BIM engineering in Istanbul to jobsite handover in Guildford.

Week 1–2 1

BS EN 1993 Engineering & Building Control Pack

Detailed structural calculation pack submitted to the client's Approved Inspector for UK Building Regulations Part A & Part L sign-off.

Week 3 2

CNC Roll-Forming & High-Cube Packing

Profiles pre-notched, punched, dimpled and strapped into sequentially labeled bundles optimized for 40ft container loading.

Week 4–5 3

Container Maritime Shipping to London Gateway

Direct container vessel transit from Yılport Gebze to London Gateway port. Cleared under UK FTA with 0% tariff.

Week 6 4

Rapid Jobsite Assembly in Surrey

Frame erection completed in 8 days by a local framing team led by SerVilla's bilingual field supervisor.

Clear Responsibility Boundary

Scope Division on the Guildford Project

Transparent delineation between factory-engineered elements and local on-site trade coordination.

Manufactured & Supplied by SerVilla

  • Complete S350GD+Z275 CNC-numbered structural frame kit
  • Full BS EN 1993 calculation pack and foundation loading diagrams
  • 3D axonometric assembly blueprint and bolt schedules
  • High-tensile zinc-plated fastener packs and foundation hold-down anchors
  • On-site SerVilla supervisor to oversee initial ground alignment and roof erection

Executed by Client & Local Contractors

  • Planning Permission & Building Regulations Approved Inspector fee
  • Concrete strip footings and ground floor slab
  • Timber cladding facade, slate roofing, and triple glazing
  • Internal drylining, electrical, and heat pump installation

Importing a full house frame from Türkiye sounded daunting, but SerVilla made it easier than buying locally in the UK. Customs clearance was zero percent duty, and the quality of steel surpassed our expectations.

David & Sarah M.
Self-Builders · Guildford, Surrey, UK
Case Study FAQs

Technical Questions About this Project

Frequently asked engineering, customs, and assembly questions regarding the Guildford delivery.

Aucun droit de douane. L'accord bilatéral de libre-échange assure une franchise totale de douane avec attestation d'origine.

Les calculs BS EN 1993 et le coefficient U de 0,14 W/m²K ont été validés en 48h par l'inspecteur en bâtiment agréé pour les exigences Part A et Part L.

Oui. Le parement extérieur est conçu pour recevoir des plaquettes de brique anglaises, des toitures en ardoise et des bardages bois selon les normes NHBC.

Explore Related Work

Similar European Projects & Case Studies

Discover other high-performance steel frame homes engineered and delivered across Europe.

Villa Bellagio — Résidence de Standing en Ossature Acier sur les Rives du Lac de Côme, Italie
🇮🇹 Bellagio 314 m²

Villa Bellagio — Résidence de Standing en Ossature Acier sur les Rives du Lac de Côme, Italie

Villa sur mesure de 314 m² avec piscine en terrain alpin escarpé, dimensionnée selon les normes parasismiques italiennes NTC 2018 et livrée sans droits de douane (A.TR).

2 Floors
4 Beds
3 Baths
Weather-Tight Shell
Résidence Alpine de Bavière — Maison Passive KfW 40 en Ossature Acier à Garmisch, Allemagne
🇩🇪 Garmisch 322 m²

Résidence Alpine de Bavière — Maison Passive KfW 40 en Ossature Acier à Garmisch, Allemagne

Maison alpine contemporaine de 322 m² calculée pour des surcharges de neige extrêmes (3,5 kN/m²), Statik certifiée DIN EN 1993 et isolation RE2020/Passivhaus.

2 Floors
4 Beds
3 Baths
Structural Frame Kit + Insulation
Villa Aegean Horizon — Villa Parasismique Côtière à La Canée, Crète, Grèce
🇬🇷 Chania 229 m²

Villa Aegean Horizon — Villa Parasismique Côtière à La Canée, Crète, Grèce

Villa balnéaire de 229 m² en Crète : haute résistance parasismique (Eurocode 8 / EAK Zone III, ag = 0,36g), protection anti-corrosion marine et livraison en 3 jours.

2 Floors
3 Beds
3 Baths
Weather-Tight Shell
View All 15 European Case Studies

Build a Similar Steel Villa in Your Country

Upload your architectural drawings (PDF/DWG/IFC) or select a SerVilla design to receive an itemized budgetary quotation, Eurocode statics review, and direct shipping estimate.