Prodotto in Turchia Progettato e Prodotto in Turchia · Consegna in Tutto il Mondo
Real-Time Engineering & Freight Simulator

Calcolatore Interattivo di Costi, Trasporto & Tempistiche

Configura la tua villa: stima in tempo reale i costi di fabbricazione diretta in Turchia, il trasporto su gomma o nave in Italia/Europa, i camion TIR necessari e i tempi di assemblaggio in cantiere.

1

Destination Country & Logistics Route

Route: Direct TIR / Ro-Ro Combined 0% EU Customs Duty (A.TR)
2

Floor Area & Building Geometry

Quick Sizes:
3

Delivery Package & Construction Scope

4

On-Site Installation Scope

Optional Separate Scope
Real-Time Budget Estimate

Total Estimated Investment

€0 – €0
Indicative DAP Jobsite Cost (Excl. VAT & Groundworks)
1. Manufacturing Scope: €0 – €0
2. Freight & Logistics (1 TIR): €0
Includes steel, 150mm rockwool, BoardeX & windows volume.
3. Assembly / Supervision: €0
Estimated Unit Cost: €0 – €0 / m²
Estimated Project Schedule
15 Days
Factory CNC
4 Days
Road Transit
6 Days
Site Assembly
• S350GD Galvanized Steel: ~5.4 Tons
• CO₂ Reduction vs Concrete: ~27.0 Tons Saved
• Customs Duty Rate: 0% Tariff (A.TR Document)
Indicative Estimate · Final Price is Project-Specific
Calculated budgets are baseline estimates. Binding contract pricing is determined from your specific architectural drawings, room spans, parcel snow/wind/seismic loads (Eurocodes 1/3/8), and custom finish selections.
Methodology

How Our Calculation Engine Works

Engineering precision, freight volume metrics, and transparent cost drivers explained.

1. S350GD Steel Yield Modeling

Superstructure pricing is calculated per m² of Gross Floor Area (GFA) based on finite-element roll-forming profiles with sub-millimeter precision.

2. Truck & Container Optimization

Truck requirements are dynamically computed based on package volume. A 13.6m TIR carries up to 500 m² of Frame Kit or ~160 m² of Weather-Tight Shell.

3. 0% Customs Duty (A.TR)

Under the EU-Türkiye Customs Union, European deliveries enter with 0% customs import duty when accompanied by our official A.TR Movement Certificate.

4. Fast-Track Erection Speed

Assembly schedules reflect real-world site data: a standard 150m² villa superstructure is erected within 5 to 7 days by a 4-person crew.

Scope Boundaries: Included Scope vs. Client-Supplied Items

Calculated estimates cover certified factory manufacturing, volumetric mega-TIR freight, and on-site assembly. Standard exclusions (contracted locally by client) are: ground excavation & concrete foundation slab, kitchen cabinetry/appliances, primary HVAC heat pump unit, final decorative painting, and local municipal permit fees.

Budget & Logistics FAQ

Frequently Asked Questions: Cost Estimation & Logistics Calculation

Transparent answers regarding budgetary precision, freight calculation methodology, customs duties, and turnkey scope inclusions.

Il calcolatore online fornisce stime indicative con un margine di precisione di circa ±5-8%, calibrate su centinaia di forniture europee. Il prezzo definitivo a corpo viene bloccato dopo la revisione del file CAD 3D.

Il pacchetto Grezzo Avanzato comprende la struttura in acciaio S350GD, lastre esterne idrorepellenti, isolamento in lana di roccia, capriate con manto di copertura e serramenti triplo vetro ad alte prestazioni.

I costi di trasporto vengono calcolati tramite matrici chilometriche reali dal nostro stabilimento di Gebze al paese di consegna, impiegando bilichi telonati da 13,6 m o container marittimi da 40 piedi High Cube.

Le ville a due piani dimezzano l'impronta a terra, riducendo del 50% i metri quadrati di platea e di copertura a parità di superficie abitabile, con un risparmio complessivo dell'8-12% al m².

Basta cliccare su "Richiedi Preventivo Formale Vincolante" e allegare i disegni o le informazioni del lotto. Il nostro ufficio tecnico formulerà la proposta contrattuale definitiva entro 24 ore.