Made in Turkey Engineered & Manufactured in Türkiye · Delivered Worldwide
Real-Time Engineering & Freight Simulator

Interactive Villa Cost, Freight & Timeline Calculator

Configure your project specifications to calculate instant factory-direct manufacturing budgets, road freight costs across Europe, container/truck requirements, steel tonnage, and on-site assembly durations.

1

Destination Country & Logistics Route

Route: Direct TIR / Ro-Ro Combined 0% EU Customs Duty (A.TR)
2

Floor Area & Building Geometry

Quick Sizes:
3

Delivery Package & Construction Scope

4

On-Site Installation Scope

Optional Separate Scope
Real-Time Budget Estimate

Total Estimated Investment

€0 – €0
Indicative DAP Jobsite Cost (Excl. VAT & Groundworks)
1. Manufacturing Scope: €0 – €0
2. Freight & Logistics (1 TIR): €0
Includes steel, 150mm rockwool, BoardeX & windows volume.
3. Assembly / Supervision: €0
Estimated Unit Cost: €0 – €0 / m²
Estimated Project Schedule
15 Days
Factory CNC
4 Days
Road Transit
6 Days
Site Assembly
• S350GD Galvanized Steel: ~5.4 Tons
• CO₂ Reduction vs Concrete: ~27.0 Tons Saved
• Customs Duty Rate: 0% Tariff (A.TR Document)
Indicative Estimate · Final Price is Project-Specific
Calculated budgets are baseline estimates. Binding contract pricing is determined from your specific architectural drawings, room spans, parcel snow/wind/seismic loads (Eurocodes 1/3/8), and custom finish selections.
Methodology

How Our Calculation Engine Works

Engineering precision, freight volume metrics, and transparent cost drivers explained.

1. S350GD Steel Yield Modeling

Superstructure pricing is calculated per m² of Gross Floor Area (GFA) based on finite-element roll-forming profiles with sub-millimeter precision.

2. Truck & Container Optimization

Truck requirements are dynamically computed based on package volume. A 13.6m TIR carries up to 500 m² of Frame Kit or ~160 m² of Weather-Tight Shell.

3. 0% Customs Duty (A.TR)

Under the EU-Türkiye Customs Union, European deliveries enter with 0% customs import duty when accompanied by our official A.TR Movement Certificate.

4. Fast-Track Erection Speed

Assembly schedules reflect real-world site data: a standard 150m² villa superstructure is erected within 5 to 7 days by a 4-person crew.

Scope Boundaries: Included Scope vs. Client-Supplied Items

Calculated estimates cover certified factory manufacturing, volumetric mega-TIR freight, and on-site assembly. Standard exclusions (contracted locally by client) are: ground excavation & concrete foundation slab, kitchen cabinetry/appliances, primary HVAC heat pump unit, final decorative painting, and local municipal permit fees.

Budget & Logistics FAQ

Frequently Asked Questions: Cost Estimation & Logistics Calculation

Transparent answers regarding budgetary precision, freight calculation methodology, customs duties, and turnkey scope inclusions.

The online calculator provides indicative budget estimates with approximately ±5% to ±8% accuracy based on hundreds of completed European deliveries. Final contract pricing is fixed and binding upon formal 3D CAD/BIM review.

The Weather-Tight Shell package includes the S350GD galvanized steel superstructure, exterior high-performance BoardeX/OSB sheathing, rockwool cavity thermal insulation, roof trusses with roofing tiles/membranes, and triple-glazed Low-E windows.

Freight is calculated using real-time European road distance matrices from our Gebze facility to your destination country for dedicated 13.6m curtainsider mega-trucks or 40ft High Cube sea shipping containers.

Two-storey designs concentrate floor area on a smaller ground footprint, cutting foundation slab concrete volume and roof surface area by approximately 50% per m² of usable living space.

Simply click "Request Formal Binding Quote" at the bottom of the calculator and upload your preliminary floor plans or plot details. Our engineering department will email you an itemized contract offer within 24 hours.