Villa sur mesure de 314 m² avec piscine en terrain alpin escarpé, dimensionnée selon les normes parasismiques italiennes NTC 2018 et livrée sans droits de douane (A.TR).
The property was situated on a 32-degree steep hillside with narrow mountain access roads overlooking Lake Como. Conventional reinforced concrete construction would have required extensive hillside excavation, heavy tower cranes, and months of disruptive road closures.
SerVilla engineered a high-tensile cold-formed steel structure weighing only 16.4 tons (70% lighter than concrete). The framing members were pre-engineered to transport lengths and delivered by medium rigid trucks. A local 4-man construction team guided by one SerVilla bilingual supervisor erected the full structural frame and weather-tight shell in just 12 working days without heavy cranes.
From initial 3D BIM engineering in Istanbul to jobsite handover in Bellagio.
BIM 3D modeling in Vertex BD and 3D finite-element stress analysis. Full structural calculation book (Relazione di Calcolo) and foundation reaction tables delivered to client's Italian civil engineer for Genio Civile filing.
High-speed roll-forming of all S350GD galvanized profiles with 100% individual inkjet part numbering and sequential package strapping for steep site delivery.
Issuance of official A.TR Movement Certificate (0% EU customs duty). Loading onto standard mega curtainsider truck, Ro-Ro sailing from Pendik to Trieste, and direct highway haulage to Como.
Chemical anchor bolt setting on concrete slab, ground floor wall assembly, floor diaphragm joists, and roof truss erection overseen on site by a bilingual SerVilla structural engineer.
Transparent delineation between factory-engineered elements and local on-site trade coordination.
Building on a steep slope over Lake Como seemed impossible with local concrete contractors. SerVilla delivered the entire frame in days, the statics passed Genio Civile without a single objection, and the thermal insulation in winter is extraordinary.
Frequently asked engineering, customs, and assembly questions regarding the Bellagio delivery.
Oui. Le dossier de calcul respectait scrupuleusement les NTC 2018 et les Eurocodes 1, 3 et 8 avec analyse spectrale 3D, validé rapidement par le Genio Civile.
Les profilés en acier ont été pré-dimensionnés pour le transport et livrés par camions porteurs. Pesant 70% de moins que le béton, l'ossature a été montée en 12 jours sans grue lourde.
Oui. L'association de 140 mm de laine minérale entre montants et d'une ITE de 80 mm atteint un coefficient U de 0,15 W/m²K, dépassant les exigences de la région Lombardie.
Discover other high-performance steel frame homes engineered and delivered across Europe.
Maison alpine contemporaine de 322 m² calculée pour des surcharges de neige extrêmes (3,5 kN/m²), Statik certifiée DIN EN 1993 et isolation RE2020/Passivhaus.
Villa balnéaire de 229 m² en Crète : haute résistance parasismique (Eurocode 8 / EAK Zone III, ag = 0,36g), protection anti-corrosion marine et livraison en 3 jours.
Kit d'ossature acier de 181 m² conforme aux normes britanniques BS EN 1993 et Part L, importé à 0% de douane via l'accord UK-Turquie.