Three flexible assembly options tailored to your project requirements: from precision self-assembly kits with 3D BIM step-by-step manuals, to on-site European engineer supervision and turnkey certified erection.
Ideal for regional general contractors and experienced developers. We manufacture, number, and deliver the complete kit with installation-ready 3D shop drawings. Your local crew executes the erection.
The optimal balance of speed, cost-efficiency, and engineering rigor. We deploy a bilingual SerVilla structural engineer to your jobsite to direct your local workers and verify structural compliance.
Turnkey erection executed by SerVilla’s factory-certified installation crews. Available in selected European destinations (Germany, Italy, Balkans, Greece) and multi-villa developer projects.
How a custom light gauge steel villa transforms from packed shipping container to a weather-tight structural shell in less than two weeks.
Stage 01 · Day 1
Laser slab survey, EPDM acoustic damp-proof membrane, and base track chemical anchoring into concrete.
Stage 02 · Day 2-3
Panels stood up and interlocked via pre-punched CNC dimples, diagonal shear straps, and hold-down brackets.
Stage 03 · Day 4-5
Open-web floor cassettes and roof trusses hoisted and bolted with pre-punched MEP plumbing chases.
Stage 04 · Day 6-8
OSB-3 / BoardeX exterior sheathing boards fastened to studs, providing full lateral shear diaphragm strength.
Stage 05 · Day 9-12
Breathable membrane, triple-glazed windows, and exterior cladding installed. Ready for interior fit-out.
Light gauge steel construction eliminates the need for expensive heavy tower cranes or concrete pumpers. Standard hand and power tools are all that is required.
18V/20V brushless impact drivers with magnetic hex socket bits for high-speed wafer-head steel fasteners.
Self-leveling cross-line green beam laser levels to verify 90° corner squareness and stud plumbness.
SDS-plus rotary hammer drill with 12mm / 16mm bits for concrete foundation hold-down anchoring.
Mobile aluminum scaffolding towers and adjustable steel props for temporary roof truss bracing.
When you choose Supply + Supervision, our bilingual structural engineer acts as your technical guardian on-site. We eliminate contractor hesitation, guarantee sub-millimeter tolerances, and ensure full Eurocode 3 & 8 compliance.
Learn more about equipment, crew sizes, supervision scheduling, and weather protection.
Mit einem 3–4-köpfigen Montageteam steht das komplette Tragwerk (Wände, Zwischendecken, Dachstühle) in 5 bis 7 Werktagen. Die wetterfeste Beplankung und Dämmebene benötigt weitere 4 bis 6 Tage.
Für 1–2-geschossige Villen sind keine schweren Kräne erforderlich, da einzelne LGSF-Profile unter 15–25 kg wiegen. Handelsübliche Akku-Schlagschrauber, Bohrhämmer, Laser-Nivelliergeräte und leichte Rüstung reichen vollkommen aus.
Unser zweisprachiger Ingenieur prüft am ersten Tag die Bodenplattentoleranzen, überwacht die Verankerung, weist Ihre Handwerker anhand des 3D-BIM-Modells ein und unterzeichnet das offizielle Montageabnahmeprotokoll.
Choose your preferred delivery package and installation mode in our interactive quotation tool to receive a comprehensive factory-direct estimate.