Hergestellt in der Türkei Konstruiert & Hergestellt in der Türkei · Weltweite Lieferung
Real-Time Engineering & Freight Simulator

Interaktiver Baukosten- & Frachtkostenrechner

Konfigurieren Sie Ihr Projekt: Berechnen Sie Richtpreise für die Leichtstahl-Fertigung ab Werk Türkiye, LKW-Frachtkosten nach Europa, LGSF-Stahltonnage und Montagezeiten in Echtzeit.

1

Destination Country & Logistics Route

Route: Direct TIR / Ro-Ro Combined 0% EU Customs Duty (A.TR)
2

Floor Area & Building Geometry

Quick Sizes:
3

Delivery Package & Construction Scope

4

On-Site Installation Scope

Optional Separate Scope
Real-Time Budget Estimate

Total Estimated Investment

€0 – €0
Indicative DAP Jobsite Cost (Excl. VAT & Groundworks)
1. Manufacturing Scope: €0 – €0
2. Freight & Logistics (1 TIR): €0
Includes steel, 150mm rockwool, BoardeX & windows volume.
3. Assembly / Supervision: €0
Estimated Unit Cost: €0 – €0 / m²
Estimated Project Schedule
15 Days
Factory CNC
4 Days
Road Transit
6 Days
Site Assembly
• S350GD Galvanized Steel: ~5.4 Tons
• CO₂ Reduction vs Concrete: ~27.0 Tons Saved
• Customs Duty Rate: 0% Tariff (A.TR Document)
Indicative Estimate · Final Price is Project-Specific
Calculated budgets are baseline estimates. Binding contract pricing is determined from your specific architectural drawings, room spans, parcel snow/wind/seismic loads (Eurocodes 1/3/8), and custom finish selections.
Methodology

How Our Calculation Engine Works

Engineering precision, freight volume metrics, and transparent cost drivers explained.

1. S350GD Steel Yield Modeling

Superstructure pricing is calculated per m² of Gross Floor Area (GFA) based on finite-element roll-forming profiles with sub-millimeter precision.

2. Truck & Container Optimization

Truck requirements are dynamically computed based on package volume. A 13.6m TIR carries up to 500 m² of Frame Kit or ~160 m² of Weather-Tight Shell.

3. 0% Customs Duty (A.TR)

Under the EU-Türkiye Customs Union, European deliveries enter with 0% customs import duty when accompanied by our official A.TR Movement Certificate.

4. Fast-Track Erection Speed

Assembly schedules reflect real-world site data: a standard 150m² villa superstructure is erected within 5 to 7 days by a 4-person crew.

Scope Boundaries: Included Scope vs. Client-Supplied Items

Calculated estimates cover certified factory manufacturing, volumetric mega-TIR freight, and on-site assembly. Standard exclusions (contracted locally by client) are: ground excavation & concrete foundation slab, kitchen cabinetry/appliances, primary HVAC heat pump unit, final decorative painting, and local municipal permit fees.

Budget & Logistics FAQ

Frequently Asked Questions: Cost Estimation & Logistics Calculation

Transparent answers regarding budgetary precision, freight calculation methodology, customs duties, and turnkey scope inclusions.

Der Online-Rechner liefert Richtwerte mit einer Genauigkeit von ca. ±5 % bis ±8 %, basierend auf hunderten realisierten Projekten in Europa. Das verbindliche Festpreisangebot erfolgt nach der 3D-BIM-Prüfung.

Das geschlossene Rohbau-Paket umfasst das S350GD-Stahltragwerk, diffusionsoffene Außenbeplankung, Steinwolle-Kerndämmung, Dachträger inklusive Eindeckung und 3-fach verglaste Passivhaus-Fenster.

Die Frachtkosten werden anhand von Echtzeit-Entfernungsmatrizen von unserem Werk in Gebze zum jeweiligen Zielland für 13,6m Planen-Megatrailer oder 40ft HC-Seecontainer berechnet.

Zweigeschossige Gebäude halbieren den Grundflächenbedarf, wodurch Fundament- und Dachflächen pro m² Wohnfläche um rund 50 % sinken und die Gesamtkosten um 8 % bis 12 % reduzieren.

Klicken Sie am Ende des Rechners auf "Verbindliches Angebot anfordern" und laden Sie Ihre Pläne hoch. Unser Ingenieurteam sendet Ihnen binnen 24 Stunden ein detailliertes Vertragsangebot.