Hergestellt in der Türkei Konstruiert & Hergestellt in der Türkei · Weltweite Lieferung
🇬🇧 Guildford, United Kingdom Structural Frame Kit Supply + Supervision

Surrey Modernes Ökohaus — Energieeffizientes Einfamilienhaus in Surrey, UK

181 m² Leichtstahl-Bausatz nach britischen Baustandards (BS EN 1993, Part L) mit 0 % Zoll über das UK-Türkei-Freihandelsabkommen.

Project Scale
181 m² Area
2 Floors · 3 Beds · 3 Baths
Structural Mass
11.8 Tons
S350GD + Z275 Hot-Dip Galvanized
Factory & Transit
12 Days
Direct factory-to-jobsite haulage
Site Framing Time
8 Working Days
Supervised dry erection
Engineering Case Study

Overcoming Site & Structural Constraints

The Engineering & Logistical Challenge

Post-Brexit UK customs complexities and stringent Building Control approval processes (Building Regulations Part A, B, and L) created hesitations about sourcing prefabricated framing overseas.

The SerVilla Pre-Engineered Steel Solution

SerVilla supplied an airtight commercial dossier with FTA Statement on Origin (guaranteeing 0% duty) and comprehensive BS EN 1993 calculation books counter-checked for UK national annexes. The Approved Inspector signed off the structural calculations in 48 hours.

International Freight & Customs Route
Direct ocean freight via 40ft High Cube container from Gebze to London Gateway port in 12 days. Handled on DAP terms with direct container destuffing at the Surrey residential plot.
Verified Specifications

Project Data Dossier

Destination: Guildford, United Kingdom
Gross Area: 181 m²
Delivery Package: Structural Frame Kit
Installation Mode: Supply + Supervision
Steel Mass: 11.8 Tons (S350GD+Z275 Structural Steel)
Customs Duty: 0% (A.TR / FTA Cert.)
Milestones & Schedule

Step-by-Step Project Execution Log

From initial 3D BIM engineering in Istanbul to jobsite handover in Guildford.

Week 1–2 1

BS EN 1993 Engineering & Building Control Pack

Detailed structural calculation pack submitted to the client's Approved Inspector for UK Building Regulations Part A & Part L sign-off.

Week 3 2

CNC Roll-Forming & High-Cube Packing

Profiles pre-notched, punched, dimpled and strapped into sequentially labeled bundles optimized for 40ft container loading.

Week 4–5 3

Container Maritime Shipping to London Gateway

Direct container vessel transit from Yılport Gebze to London Gateway port. Cleared under UK FTA with 0% tariff.

Week 6 4

Rapid Jobsite Assembly in Surrey

Frame erection completed in 8 days by a local framing team led by SerVilla's bilingual field supervisor.

Clear Responsibility Boundary

Scope Division on the Guildford Project

Transparent delineation between factory-engineered elements and local on-site trade coordination.

Manufactured & Supplied by SerVilla

  • Complete S350GD+Z275 CNC-numbered structural frame kit
  • Full BS EN 1993 calculation pack and foundation loading diagrams
  • 3D axonometric assembly blueprint and bolt schedules
  • High-tensile zinc-plated fastener packs and foundation hold-down anchors
  • On-site SerVilla supervisor to oversee initial ground alignment and roof erection

Executed by Client & Local Contractors

  • Planning Permission & Building Regulations Approved Inspector fee
  • Concrete strip footings and ground floor slab
  • Timber cladding facade, slate roofing, and triple glazing
  • Internal drylining, electrical, and heat pump installation

Importing a full house frame from Türkiye sounded daunting, but SerVilla made it easier than buying locally in the UK. Customs clearance was zero percent duty, and the quality of steel surpassed our expectations.

David & Sarah M.
Self-Builders · Guildford, Surrey, UK
Case Study FAQs

Technical Questions About this Project

Frequently asked engineering, customs, and assembly questions regarding the Guildford delivery.

Nein, 0 % Zölle. Das Freihandelsabkommen zwischen UK und der Türkei stellt den zollfreien Import mit offizieller Ursprungserklärung sicher.

Die Statik wurde nach BS EN 1993 mit UK-Anhängen berechnet. Der Wand-U-Wert von 0,14 W/m²K erfüllte die Part-L-Vorgaben für den Approved Inspector problemlos.

Ja. Die Außenbeplankung ist für britische Riemchen-Klinkersysteme, Naturschiefer und Holzfassaden nach NHBC-Standards ausgelegt.

Explore Related Work

Similar European Projects & Case Studies

Discover other high-performance steel frame homes engineered and delivered across Europe.

Villa Bellagio — Exklusive Leichtstahl-Hangresidenz am Comer See, Italien
🇮🇹 Bellagio 314 m²

Villa Bellagio — Exklusive Leichtstahl-Hangresidenz am Comer See, Italien

314 m² maßgeschneiderte Leichtstahlvilla mit Pool an Hanglage, bemessen nach NTC 2018 Erdbebennormen und geliefert mit A.TR (0 % Zoll).

2 Floors
4 Beds
3 Baths
Weather-Tight Shell
Bavaria Alpenresidenz — KfW 40 Passivhaus-Leichtstahlvilla in Garmisch-Partenkirchen, Deutschland
🇩🇪 Garmisch 322 m²

Bavaria Alpenresidenz — KfW 40 Passivhaus-Leichtstahlvilla in Garmisch-Partenkirchen, Deutschland

322 m² exklusives Alpenwohnhaus mit prüffähiger Statik nach DIN EN 1993-1-3, 3,5 kN/m² Schneelastbemessung und KfW-40-Wärmedämmverbundsystem.

2 Floors
4 Beds
3 Baths
Structural Frame Kit + Insulation
Aegean Horizon Villa — Erdbebensichere Küstenvilla in Chania, Kreta, Griechenland
🇬🇷 Chania 229 m²

Aegean Horizon Villa — Erdbebensichere Küstenvilla in Chania, Kreta, Griechenland

229 m² moderne Ferienvilla auf Kreta: Ausgelegt für extreme Erdbebenzonen (EAK Zone III), meersalzresistent beschichtet und in 3 Tagen per Inselfähre geliefert.

2 Floors
3 Beds
3 Baths
Weather-Tight Shell
View All 15 European Case Studies

Build a Similar Steel Villa in Your Country

Upload your architectural drawings (PDF/DWG/IFC) or select a SerVilla design to receive an itemized budgetary quotation, Eurocode statics review, and direct shipping estimate.