Hergestellt in der Türkei Konstruiert & Hergestellt in der Türkei · Weltweite Lieferung
Most Popular for Builders & Contractors Direct Factory Export from Türkiye

Stahlrahmen-Bausatz (Structural Frame Kit)

Präzisionsgefertigter, feuerverzinkter Leichtstahl-Rahmen mit vorgestanzten Serviceöffnungen und voller Einzelteil-Nummerierung.

Stahlrahmen-Bausatz (Structural Frame Kit)
SerVilla Precision Export Package: Stahlrahmen-Bausatz (Structural Frame Kit)

Engineering & Technical Specifications

Steel Metallurgy: S350GD + Z275 Hot-Dip Galvanized Structural Steel (Yield Strength ≥ 350 N/mm²)
Corrosion Protection: 275 g/m² Zinc Coating (Compliant with EN 10346, 50+ Year Design Life)
Profile Gauges: 0.90 mm – 2.00 mm CNC Precision Roll-Formed C & U Sections
MEP Service Chases: Pre-punched CNC grommet holes at 600mm centers for electrical conduits & PEX plumbing
Fastening System: Hex-head structural expansion anchors, hold-down brackets, and self-drilling screws
Structural Codes: EN 1993-1-3 (Eurocode 3), EN 1998-1 (Eurocode 8 Seismic), AISC / IBC Compliant

Freight Density & Export Packaging

Container Loading Efficiency

450 m² to 600 m² floor area per 40ft High Cube Container

Customs Status (EU)

0% Customs Duty to EU (A.TR Certificate included)

Manufacturing Lead Time

15 to 20 business days manufacturing in Istanbul/Gebze

Estimated Site Erection Speed

4 to 6 days for a 150m² villa superstructure with a 4-person crew

Itemized Inclusions in Stahlrahmen-Bausatz (Structural Frame Kit)

Every component below is precision-manufactured, inspected, and accounted for in your Bill of Materials (BOM):

  • All exterior load-bearing wall frames pre-punched and dimpled for precision screw fit
  • Interior partition wall frames designed to receive standard 12.5mm gypsum drywalls
  • Engineered floor joist cassettes or lattice steel girders for multi-storey stability
  • Complete roof truss system, rafters, ceiling joists, purlins and bracing members
  • Full structural connection package: hold-downs, anchor brackets, heavy-duty shear angles
  • Industrial container packing plan with color-coded bundle labels matching erection phases
  • Stamped Eurocode static calculation report and foundation interface reaction load schedule
  • Step-by-step 3D assembly manual and 24/7 engineering video call erection support

Scope Exclusions (To be Sourced Locally)

To maintain maximum commercial transparency and prevent budget discrepancies, the following works and materials are excluded from this specific package:

  • Exterior wall sheathing boards (OSB-3, BoardeX or Fiber Cement)
  • Thermal cavity insulation (Rockwool / Mineral Wool)
  • Doors, windows, and exterior siding panels
  • Roof covering (Metal standing seam sheets or roof tiles)
  • Interior drywall boards, plumbing pipes, electrical wiring and sanitary fixtures
  • Concrete foundation slab and casting works

Compare with Other Delivery Packages:

Technical FAQ

Frequently Asked Questions: Stahlrahmen-Bausatz (Structural Frame Kit)

Für Bauunternehmer und erfahrene Handwerker bietet der "Structural Frame Kit" die höchste Ladedichte und geringste Frachtkosten pro m². Für private Bauherren und Projektentwickler ist das "Weather-Tight Shell" (Ausbauhaus) die ideale Balance aus Baugeschwindigkeit, Wärmedämmung und Qualitätskontrolle.

Ja. Neben unseren hocheffizienten Standardaufbauten (z. B. 150 mm Steinwolle + BoardeX/OSB-3 + WPC-/Alu-Fassadenpaneele) passen wir Dämmstärken und Oberflächen exakt an nationale Effizienzstandards (wie KfW 40 in Deutschland, RE2020 in Frankreich) an.

Alle Leichtstahlprofile werden mit Hochleistungsbändern gebündelt, in wasserdichte UV-Schutzfolie eingeschlagen und mit farbcodierten Montageetiketten versehen. Die Beladung im LKW oder Container erfolgt nach einem 3D-Stauplan in exakter Montagereihenfolge.

Das "Engineering Only" Paket richtet sich an Entwickler und Produzenten mit eigenem Profilierwerk. Wir liefern die 3D-BIM-Planung, Eurocode-Statikunterlagen, CNC-Maschinencodes (Vertex BD / FrameCAD-kompatibel) und Montagezeichnungen ohne Materiallieferung.

Ja. Viele Kunden starten in der Budgetphase mit dem Tragwerksbausatz (Frame Kit) und erweitern die Bestellung auf das Ausbauhaus (Weather-Tight Shell), sobald Fenster- und Fassadendetails feststehen. Alle Anpassungen werden vor Produktionsfreigabe transparent kalkuliert.