Made in Turkey Engineered & Manufactured in Türkiye · Delivered Worldwide
For General Contractors & Regional Builders

Precision LGSF Kits & Subcontracting for Contractors

Expand your building business into offsite steel framing without capital investment in machinery. Receive 100% numbered kits with step-by-step 3D manuals and rapid erection.

Request Project Quotation Execution Workflow Technical Engineer Desk
4-6 Days
Frame Assembly Time
4-person crew for 150m²
No Crane
Lifting Requirement
Profiles hand-carryable (3-15 kg)
100% Inkjet
Element Traceability
Every stud & track numbered
On-Site
Engineer Supervision Option
SerVilla engineer trains your team
Precision LGSF Kits & Subcontracting for Contractors
SerVilla Specialized Engineering Solution: For General Contractors & Regional Builders
Engineered Efficiency

Industry Challenges vs. SerVilla Engineered Solution

For general contractors and regional builders, adopting LGSF technology provides a decisive competitive edge: you build in half the time with half the on-site labor. SerVilla acts as your dedicated offsite manufacturing partner in Türkiye. We roll-form every stud with pre-punched MEP chases, dimpled screw locations, and inkjet piece labels matching our 3D assembly software. Your existing carpentry or drywall crews assemble the frame in days using standard cordless tools.

Traditional Problem

Shortage of bricklayers and formwork carpenters limits how many concurrent projects a contractor can take on.

SerVilla Engineered Solution

LGSF framing requires only standard dry-construction crews. A 4-person team can erect 10+ villa structures per year with zero wet trades.

Traditional Problem

Material wastage, site cutting mistakes, and disposal dump fees reduce project profitability by 8-12%.

SerVilla Engineered Solution

Zero site cutting. Every profile is pre-cut to millimeter exactness in factory CNC roll-forming with pre-punched service grommets.

Procurement Architecture

Recommended Delivery Package & Scope of Responsibility

Clear transparency: exactly what SerVilla manufactures and ships from Türkiye vs. what is arranged on your local jobsite.

Recommended for this profile

Structural Frame Kit

Precision CNC roll-formed galvanized structural steel superstructure (walls, floor joists, roof trusses) with 100% inkjet numbering and hardware.

Key Package Inclusions:

  • All exterior load-bearing wall frames pre-punched and dimpled for precision screw fit
  • Interior partition wall frames designed to receive standard 12.5mm gypsum drywalls
  • Engineered floor joist cassettes or lattice steel girders for multi-storey stability
  • Complete roof truss system, rafters, ceiling joists, purlins and bracing members
  • Full structural connection package: hold-downs, anchor brackets, heavy-duty shear angles
Full Package Details Compare All Packages

Scope Division: Factory vs. Jobsite

✓ SerVilla Supply & Responsibility:
  • • 3D BIM structural modeling & MEP clash coordination
  • • Certified Eurocode 1/3/8 static calculation reports
  • • S350GD+Z275 CNC roll-formed galvanized superstructure
  • • 100% inkjet member numbering matching 3D assembly plans
  • • Complete hardware fastening package & anchor bolt schedule
  • • DAP export logistics & 0% EU customs documentation (A.TR)
⚑ Handled Locally by Client / Contractor:
  • • Municipal building permit & local architectural stamping
  • • Concrete foundation slab / footings according to anchor plan
  • • Local utility connections (water, sewer, grid electricity)
  • • Local interior finishes (ceramic tiles, painting, sanitaryware)
Engineering Parameters

Technical Specification & Standards

Certified structural engineering parameters, steel metallurgy, and acoustic/thermal ratings.

Assembly Speed 25–35 m² of floor area framed per day with a 4-worker crew
Fastener Hardware Self-drilling wafer-head screws, chemical & mechanical anchor bolts included
Tooling Needed Standard cordless drill drivers, laser levels, chop saw (no heavy cranes needed for 1-2 floors)
Inkjet Identification Full text printing on each profile: Project Name, Unit No, Wall ID, Member No
3D Assembly Guide Interactive 3D isometric viewer & step-by-step PDF assembly drawings
Supervision Scope Optional on-site certified engineer deployment for 3 to 7 working days
Execution Journey

5-Phase Project Workflow for For General Contractors & Regional Builders

From initial concept / CAD upload to final turnkey or supervised assembly on site.

01

Submit Project Architectural Drawings

Send your client's DWG/PDF drawings. We provide a guaranteed subcontract price and Bill of Materials (BOM) within 48 hours.

02

Static Analysis & Anchor Load Plan Delivery

We issue stamped Eurocode calculations and anchor bolt layout blueprints so your team can pour the concrete slab with complete precision.

03

Kit Roll-Forming & Palletized Dispatch

CNC manufacturing in Gebze. Components are strapped into color-coded bundles by wall assembly phase and dispatched via direct truck.

04

Supervised or Self-Assembly on Site

Your team erects the villa using our 3D numbered guide. If requested, our senior structural engineer assists on site for the first days.

Relevant Case Study

Surrey Modern Eco-House — Detached Sustainable Home in Surrey, United Kingdom

Explore how SerVilla manufactured and shipped a 181m² precision steel frame house kit to Surrey, UK. BS EN 1993 statics, 0% tariff with UK FTA, and 12-day container sea transit.

180 m²
Gross Area
6 Days
Erection Time
Guildford
United Kingdom
Read Case Study Log

Engineering Highlights

  • Steel Metallurgy: S350GD + Z275 Hot-Dip Galvanized
  • Structural Standard: Eurocode 1/3/8 Verified
  • Thermal Envelope: U = 0.14 W/m²K (Passivhaus standard)
  • Logistics: Direct road transport from Gebze to jobsite
Audience Questions

Frequently Asked Questions

Do my workers need specialized steel framing certification to assemble the kit? +
No specialized welding or heavy rigging certifications are required. Because all profiles are pre-punched, dimpled, and numbered, any standard carpentry, drywall, or general construction crew can assemble the structure using our 3D visual guide and cordless screw drivers.
Are all fastening screws and anchor bolts included in the kit? +
Yes. Our Structural Frame Kit includes 100% of structural wafer-head self-drilling screws, heavy-duty hold-down brackets, shear angles, and heavy-duty concrete anchor bolts calculated for the foundation interface.
What training or support does SerVilla offer to our local carpentry or masonry crews? +
We provide comprehensive 3D step-by-step assembly manuals, direct video call assistance, and on-site master supervision deployments where our senior structural engineer trains your crew during the initial 4 to 6 day erection phase.
Alternative Profiles

Explore Other Solutions

For Private Landowners & Custom Homebuilders
Custom Steel Frame Villas for Private Landowners
For Real Estate Developers & Housing Funds
Scalable LGSF Solutions for Housing Developers
For Architects, Engineers & Specifiers
BIM Interoperability & Structural Design for Architects
For Hospitality, Resorts & Eco-Villages
Fast-Track Steel Villas for Resorts & Hospitality
For Multi-Unit Communities & Townhouse Clusters
Multi-Unit Housing & Repeating Villa Communities
For Island Logistics, Mountain & Remote Terrains
Steel Frame Solutions for Islands & Remote Sites
For International B2B Distributors & Regional Trade Partners
B2B Distribution & Partnership for Steel Villas
For Rooftop Additions, Penthouses & Urban Densification
Lightweight Steel Rooftop Extensions & Vertical Additions
Direct Manufacturer Collaboration

Request a Tailored Engineering Proposal

Upload your project plans (PDF/DWG/IFC) to receive an itemized manufacturing quote, foundation reaction load schedule, and Eurocode static feasibility assessment within 48 hours.

Upload Drawings & Get Quote Book a Technical Video Call